Stoke Maintenance Delivery Unit (MDU) Network Rail

McVeigh Offsite were appointed by Cleshar Contract Services for the Structural Design, supply and installation of a track side Maintenance Delivery Unit constructed using SIP and timber frame panels. “Key to the client was the whole life costing and recognition of embodied carbon with the build and during use. The design uses a low carbon material call Structural Insulated Panels (SIPs) which is much cheaper, greener and quicker to install. SIPs are often used in the wider building industry but are not commonly used within Network Rail, exemplifying the innovation that can be brought into the rail sector via the contestability agenda”. (Pell Frischmann website)

Client Client: Cleshar Contract Services
Date Date: 2022
Location Location: Stoke
category Category: SIPS/Timber Frame