King’s College School identified a need for a dedicated indoor sports space as the existing assembly hall was considered too small for older pupils.

King’s College School identified a need for a dedicated indoor sports space as the existing assembly hall was considered too small for older pupils. To address this, they chose to demolish a small, underused building to make room for the new Centre. Providing a range of facilities including a multi-purpose hall, aerobic/dance studios and full changing facilities. To minimise heat loss from the building.
Mcveigh Offsite were appointed for the design, fabrication and installation of the panels to the project’s specification. They were then delivered following a carefully scheduled programme – minimising disruption at the active school location. The lightweight SIPs were rapidly installed inbound of the steel frame by a small team of site operatives. The accurate, offsite manufacturing approach ensured minimal alterations were required during the fit-out, keeping the project on schedule for its completion deadline.
Liverpool
2012
Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.


London
2014
McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.


Mellor
2015
Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.