Net Zero Anglesey

Ysgol Y Graig is an outstanding Net Zero Construction Build situated in Llangefni, Anglesey, designed to accommodate the needs of a modern educational institution. As a vital part of the community, the construction aimed to create a conducive learning environment while also emphasizing sustainability and innovation.

Why Net Zero Build’s are Important in Anglesey

McVeigh offsite were appointed by main contractors Wynne Construction for the design, supply and installation of the new school at Ysgol Y Graig, Anglesey. This net zero carbon design utilises cutting-edge construction techniques and materials, ensuring both structural integrity and environmental consciousness.

Net Zero Anglesey Key Features:

  • SIPs utilised for the external walls, offering superior insulation and energy efficiency, contributing to a comfortable indoor environment while minimizing energy consumption.
  • Internal Timber Frame Panels manufactured offsite providing rapid on site installation and flexibility in design.
  • The roof construction comprises timber cassettes, offering a lightweight yet robust solution that enhances architectural appeal and supports sustainable practices.
  • Steel Beams: Strategically incorporated for roof supports and sports hall formation, steel beams and columns provide structural stability and longevity of this immense space.
  • A highlight of the design, glulam columns are utilised to form external canopy spaces, adding an element of architectural elegance while demonstrating the versatility and strength of engineered wood products.

Net Zero Build achievements for Anglesey School:

The Ysgol Y Graig construction project successfully combines innovation, sustainability, and functionality to create a modern educational facility that meets the needs of both students and the community. McVeigh Offsite helped form the:

  • Creation of a high-performance building envelope, minimizing energy consumption and operational costs.
  • Integration of renewable and eco-friendly materials, reducing the project’s environmental footprint.
  • Enhancement of architectural aesthetics through the use of innovative materials and design elements.

Great work from the lads, a top quality build!

No items found.
Project Details
icon
Location:
Llangefni, Anglesey
icon
Type:
SIPs, Net Zero
icon
Status:
SIPs School
icon
Year:
2023
You may also be interested in

A selection of other McVeigh SIP projects

Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.

McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.

Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.

icon
icon