SIP build peak district – Garden Room / Gym / Airbnb

Westwood SIP build was a challenging and rewarding project, combining multiple uses into one compact, high-performance building.

Why This Project Matters

Westwood demonstrates our ability to handle complex SIP builds with:

  • Tight access and difficult logistics
  • Architect-led design collaboration
  • Full-package delivery from structural frame to internal finish
  • Expertise in delivering multi-use, high-performance spaces

Project Challenges

  • Restricted Site Access: The remote, sloped site required careful delivery and handling of materials.
  • Multiple Functions: The space needed to meet different usage requirements while maintaining energy efficiency.
  • Weather Exposure: Elevated position with strong winds and harsh winter conditions required robust structural design and airtight construction.
  • Sensitive Planning Area: Working within the aesthetic requirements of a National Park setting.

Our Solution

We delivered a full structural SIP package with full fit-out services:

  • Structural Build:
    • 142mm SIP external walls
    • 172mm SIP roof panels
    • Precision-engineered SIP structure for rapid on-site assembly
  • Internal Fit-Out:
    • Timber frame internal partitions
    • First-fix electrical installation
    • Plasterboard and full skim finish
  • External Finishes:
    • Timber cladding in line with planning requirements
    • Complete roof installation and weatherproofing
    • Airtight detailing throughout for long-term energy performance

Project Highlights

  • Build Efficiency: SIPs allowed for fast, precision installation despite the difficult access conditions.
  • Design Integrity: We worked closely with the architect to ensure all design details were delivered exactly to specification.
  • Minimal Disruption: The streamlined build process reduced site time, material waste, and impact on the surrounding landscape.
  • Energy Performance: The highly insulated SIP system ensures year-round comfort and low running costs.

Testimonial

“The team were excellent at managing both the technical and logistical challenges of this project. The attention to detail, communication, and finish quality have been outstanding.”
— Architect Partner, Westwood Project

No items found.
Project Details
icon
Location:
Peak District National Park
icon
Type:
SIPs
icon
Status:
SIP Self Build
icon
Year:
2025
You may also be interested in

A selection of other McVeigh SIP projects

Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.

McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.

Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.

icon