SIP Water Sports Centre

The Fellfoot Water Sports Centre represents a significant construction project situated in a stunning area of natural beauty at the foot of Lake Windermere.

The Fellfoot Water Sports Centre represents a significant construction project situated in a stunning area of natural beauty at the foot of Lake Windermere. Designed to serve as a hub for water-based activities, the centre caters to sporting clubs, tourists, and local school children, fostering a sense of community engagement and outdoor recreation.

McVeigh offsite were appointed by main contractors Thomas Armstrong Construction for the design, supply and installation of the SIPs element of the project. The building is constructed using prefabricated Structural Insulated Panels (SIPs), the structure is raised off the ground to avoid flood risk and make room for boat workshops.

No items found.
Project Details
icon
Location:
Lake Windermere, Cumbria
icon
Type:
SIPs
icon
Status:
Commercial
icon
Year:
2017
You may also be interested in

A selection of other McVeigh SIP projects

Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.

McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.

Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.

icon
icon