Ysgol Morswyn required a fast, high-quality extension to meet growing pupil numbers while minimising disruption to the existing school. Working alongside the appointed architect, we delivered a highly insulated, precision-engineered SIP structure that was fully erected on-site in just 1.5 weeks.The scheme involved complex site logistics due to limited access — with careful planning and close coordination with the project team, we successfully navigated these challenges to keep the build on schedule.

From the outset, we worked closely with the architect to:
This early collaboration allowed us to resolve technical challenges upfront, reducing delays and ensuring confidence in the programme.
✅ Minimal Disruption: Only 1.5 weeks on-site erection time, reducing disruption to school operations
✅ Energy Performance: High thermal performance for year-round comfort and reduced running costs
✅ Design Integrity: Structure delivered exactly to the architect’s design, with full technical coordination
✅ Programme Certainty: Careful planning ensured the project remained on schedule despite access limitations
This project reflects our approach on every SIP build: careful preparation, open collaboration with architects, and expert on-site execution — even on logistically challenging sites. Our experience in complex projects allows us to deliver high-quality results with confidence and precision.
Liverpool
2012
Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.


London
2014
McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.


Mellor
2015
Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.