Ysgol Morswyn required a fast, high-quality extension to meet growing pupil numbers while minimising disruption to the existing school. Working alongside the appointed architect, we delivered a highly insulated, precision-engineered SIP structure that was fully erected on-site in just 1.5 weeks.The scheme involved complex site logistics due to limited access — with careful planning and close coordination with the project team, we successfully navigated these challenges to keep the build on schedule.

Collaborative Approach

From the outset, we worked closely with the architect to:

  • Fully review and advise on SIP detailing and thermal performance
  • Ensure all structural connections were accurately designed for Glulam integration
  • Maintain design intent while ensuring efficient on-site assembly
  • Plan lifting and delivery sequences for restricted access

This early collaboration allowed us to resolve technical challenges upfront, reducing delays and ensuring confidence in the programme.

Technical Highlights

  • SIP Walls: 172mm panels offering excellent thermal efficiency
  • Roof Structure: Loose joist system with Glulam beams providing structural strength and design flexibility
  • Internal Finish: Timber frame wall linings to integrate with existing internal finishes
  • Precision Delivery: Off-site manufacturing ensured panels arrived fully prepared for rapid installation
  • Access Management: Specialist equipment and sequencing allowed us to overcome tight site constraints safely

Delivered Benefits

Minimal Disruption: Only 1.5 weeks on-site erection time, reducing disruption to school operations
Energy Performance: High thermal performance for year-round comfort and reduced running costs
Design Integrity: Structure delivered exactly to the architect’s design, with full technical coordination
Programme Certainty: Careful planning ensured the project remained on schedule despite access limitations

A Trusted Partner for Specialist SIP Construction

This project reflects our approach on every SIP build: careful preparation, open collaboration with architects, and expert on-site execution — even on logistically challenging sites. Our experience in complex projects allows us to deliver high-quality results with confidence and precision.

No items found.
Project Details
icon
Location:
Anglesey, North Wales
icon
Type:
SIPs, School
icon
Status:
SIPs School
icon
Year:
October 2024
You may also be interested in

A selection of other McVeigh SIP projects

Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.

McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.

Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.

icon
icon