The school in Llanfaethlu, Anglesey, was a project where we installed Roof Cassettes over a steel frame and joined them to Hay Bale filled walls externally.

The school in Llanfaethlu, Anglesey, was a project where we installed Roof Cassettes over a steel frame and joined them to Hay Bale filled walls externally. We were commissioned to install highly insulated long spanning roof cassettes, enveloping the steel elements to ensure minimal cold bridging.
The project was over 2000m sq with 125 individual cassettes, including separating dwarf walls and some load bearing timber frame. The project was completed on time and budget in 5 weeks. Working with Wynne Construction was a great experience, their commitment and dedication to assisting the project and operatives working on it, is testament to their partnering mentality.
Liverpool
2012
Located at 1A Grove Street, the University Veterinary Practice is a purpose built, state of the art veterinary practice ideally located in the heart of Liverpool, minutes from the main University Campus.


London
2014
McVeigh Offsite delivered BREEAM Excellent-rated buildings using SIPs construction methods, demonstrating sustainable building excellence.


Mellor
2015
Mellor Primary School has become quite a prestigious project for us, as it has won numerous accolades.

